Caterpillar Fleet Production And Cost Analysis Software Download6627842
Hi guys, i'm looking for this software 'Caterpillar FPC (Fleet Production and Cost Analysis)', does anyone has it to share? Hope you can help me with this. Thank you and regards.
Fleet Production and Cost Analysis Programme a.k.a FPC is one of the most popular production/cost counting programme used by not only in Caterpillar world and mining but also by big construction contractors. FPC has two main goals basicly: I. Helping to choose loader and truck type and detect its amount before project, II. To be determined of fleet cost and product. To provide supervision of costs and production during project.
FPC programme is a typical computer programme based on data entry principle. Thus detailed data about project will be needed to operate programme. (data needed are arranged below) The more real-like data, the more accurate results. Whereas gathering right data before project is hard, it is very important in working on these subjects, project owner's showing what depends on costs and being aware of factors which should be in tracking and controlling during project. Ongoing projects, it contributes to user for representing projections belonging to the future with the data taken from field that time passed until that day.
Project inputs needed for FPC: 1- Annual, monthly or shift net working hours 2- Hardware density (loose and relevant) and hardware type 3-Amount of hardware which will be excavated (ton or relevant cubic meter) 4- Haul roads details (Roads should be divided into segments according to the change of factors below.) • Road length • Percental slope of roads • Rolling resistance • Road width. Creative sound blaster live 51 cd iso.
Caterpillar Fleet Production And Cost Analysis Software_FPC_v5.3 Fleet Production & Cost Analysis (FPC) is a PC software tool designed to estimate the productivity, cost, and time required for a wide variety of earthmoving or other material handling operation’s moving material from one location to another over one or more courses. FPC takes in to account the following factors; * Site speed limits * Haul road condition - Gradients/Rolling resistance/distances * Waiting times * Machine - Availability/Bucket Fill Factor/Cycle times * Site – Material Density * Required Volumes * Operator Efficiency From this information the software provides an accurate prediction of current and future production capabilities. The FPC program and evaluation allows productivity and efficiency improvements to be made without compromise to Health & Safety. Safe travel speeds, braking, payload and operator technique are all assessed to ensure a realistic production rate can be achieved safely. In addition to this, many of the recommendations that we will make as a result of conducting FPC will have positive H&S implications. For example, flatter and better maintained haul roads will result in less wear and a reduced likelihood of accidents. The removal of bottlenecks will reduce the potential for accidents.
M026.608.37.051.00 with its Stainless steel case with PVD treatment, black dial, black bezel and orange seconds hand is presented on a rubber diver’s strap. M026.608.11.041.00 with its blue dial, blue bezel and orange-tipped seconds indicator is presented on an all Stainless steel bracelet. The upcoming Ocean Star Diver will have a water-resistance of 600 meters and will be available in two references. 600 000 midi torrent.